Local
What the Village Code Says About Concrete
Two provisions in Antioch's ordinances govern residential concrete directly: a local rule on the weather you may pour in, and a strength table the Village adopts with its building code. What each one says, and which of your projects it touches.
Most of what gets said about concrete rules is second-hand. The Village of Antioch's own code is public, and it contains two things any homeowner planning a slab this autumn or next spring should know about. One is unusual: a locally written limit on the temperatures concrete may be poured in. The other is a national table that the Village adopts wholesale, and it is where the code says anything at all about how strong a garage floor or a set of steps has to be.
Neither is a reason to put off a project, and neither is paperwork you handle yourself. They are worth knowing because they let you check that whoever pours your concrete driveway, garage slab or steps is working to the rules that actually apply here.
The Village's own weather rule
Section 9-1-3 of the Village Code, under a heading on concrete placement, does two things. It makes the contractor responsible for protecting concrete while it is placed, to the standard set in the Portland Cement Association's manual on designing and controlling concrete mixtures. And it sets temperature limits, measured by the National Weather Service rather than by a thermometer on the truck.
| Village Code 9-1-3(B)(2) | What it requires |
|---|---|
| Winter pour | Previous night at least 25°F and rising, so the pour day is at least 25°F |
| Summer pour | Air at or below 95°F at every point during the pour |
| Who measures | The National Weather Service; for heat, the approved observation site nearest the pour |
| Protection | The contractor's responsibility, to PCA's published standard |
| Adopted | Ordinance 06-10-35, October 2006 |
Two points about reading it. First, the ordinance says winter and summer months without defining them, so in practice it is the temperatures that bite, not the calendar. Second, 25 degrees is a floor below which the Village does not allow a pour at all. It is not a statement that concrete placed at 26 degrees is safe without help.
How that sits beside the industry threshold
The national guidance draws its line higher, and the two numbers answer different questions.
| Threshold | Source | What it means |
|---|---|---|
| 40°F | ACI 306R-16 | Cold-weather practice begins: protection, heat, longer curing |
| 25°F | Antioch Village Code | Below this, no pour is permitted |
Between those two lines is the stretch where a pour is allowed but has to be protected, which is exactly what the ordinance's reference to the PCA manual is pointing at. Blankets, heated water or accelerating admixtures are the normal tools. For decorative work the margin is thinner still, for reasons set out in our piece on timing a decorative pour.
The practical question for a late-season job is not whether the date is legal. It is what the crew will do between 25 and 40, and who decides to postpone if the forecast drops.
The strength table the Village adopts
Section 9-1-1 adopts the 2024 International Residential Code as Antioch's code for houses, most recently amended by ordinance in November 2025. Within it, section R402.2 requires concrete to meet the minimum strengths in Table R402.2, and to be air-entrained wherever the weathering potential is moderate or severe.
| Location (2024 IRC Table R402.2) | Negligible | Moderate | Severe |
|---|---|---|---|
| Basement slabs and interior slabs on grade, except garage floors | 2,500 | 2,500 | 2,500 |
| Porches, carport slabs and steps exposed to the weather, and garage floor slabs | 2,500 | 3,000, air-entrained | 3,500, air-entrained |
Figures are minimum specified compressive strength in psi at 28 days. Where the table calls for air entrainment, its footnote sets total air at not less than 5 percent and not more than 7.
The weathering class comes from a national map the code refers to. Antioch's local amendments do not restate it, so the right move is to ask the Building Department which column it applies. The useful thing is that in either of the two colder columns, the answer on air is the same: it has to be there.
The footnote about a smooth garage floor
This is where the code crosses into how a slab is finished, which is unusual enough to be worth pointing out. A garage floor is often finished with a steel trowel to get a hard, smooth surface that sweeps clean. Heavily troweled surfaces and high air content do not always get along, and the code allows for that in note f to the table.
For a garage floor with a steel-troweled finish, total air may be reduced to not less than 3 percent, but only if the specified strength goes up to at least 4,000 psi. In other words, the code will trade some of the freeze protection for more strength, and not for nothing. If a bid for a smooth garage floor mentions lower air, that is the condition to check it against.
What the table does not cover
Driveways, patios and walks are not in Table R402.2. The residential code is about the house and the structures attached to it, and flatwork in the yard is governed by the Village's own specification instead. For a patio here that means:
| Antioch patio specification | Requirement |
|---|---|
| Thickness | 4 inches minimum, explicitly not 3.5 |
| Mix | 6-bag, 3 to 6 percent air |
| Base | 4 inches of compacted CA-6 |
So a single project can answer to different rules in different places. Pour a new garage floor, the steps up to the side door and a patio off the back, and the first two sit in the code table while the third follows the Village spec. A contractor who treats all three as one mix is either exceeding the patio requirement, which is fine, or falling short of the garage one, which is not.
Three questions this gives you
- If the pour is late in the year, what is the plan between 25 and 40 degrees, and who calls it off?
- For any garage slab or exterior steps, what strength and air content will be ordered, and does it meet Table R402.2 for the weathering class the Village applies?
- If the garage floor will be steel-troweled with reduced air, is the strength at least 4,000 psi?
A good crew will answer all three without looking anything up. If you are planning a garage slab or a new drive and would like those answers for your own job, the driveway page is where to ask for a visit.
Sources
- Village of Antioch Code 9-1-2 and 9-1-3 - local amendments to the adopted codes, and the concrete placement rule with its winter and summer temperature limits (Ord. 06-10-35). Read 28 September 2026.
- Village of Antioch Code 9-1-1 - adoption of the 2024 International Residential Code (amended by Ord. 25-11-70, November 2025). Read 28 September 2026.
- ICC, 2024 International Residential Code, section R402.2 and Table R402.2 - minimum concrete strength by location and weathering, air entrainment, and the steel-troweled garage floor exception. Read 28 September 2026.
- ICC, 2024 International Residential Code, Table R301.2 - how the weathering class is determined. Read 28 September 2026.