The Village does not keep a contractor register, and the permit is priced as a slice of your bid rather than as a flat fee. Two unusual facts that between them decide how you should choose, and one clause that rescues awkward lots.
Two things about doing driveway work here are genuinely different from the towns around it, and they pull in opposite directions. The money the Village takes moves with the size of your job. The vetting the Village does of who performs it is nil.
Neither is a criticism. Between them, though, they change how a homeowner here ought to go about choosing, and neither will appear in any national guide.
Everything the code fixes for you
| Provision | Antioch | The trap |
|---|---|---|
| Width | 20 ft maximum at the curb | Measured at the street, not at the garage |
| Setback | 5 ft from any property line | Rules out many first drafts on narrow lots |
| Side-loaded garage | May encroach that setback if 5 ft of green space is kept between your drive and the neighbouring one | The clause that rescues tight lots |
| Permit charge | 2% of declared project cost, or $50, whichever comes out higher | Scales with the job, so it belongs on the quote |
| Filing fee | $12, on top | Small, but it is separate |
| Contractor register | None maintained by the Village | No official list to check anyone against |
Each provision above is cited below. The rest of this page is what to do about the two that make Antioch unlike its neighbours.
Fact one: the fee moves with your bid, which hands you a cross-check
Most municipalities charge a flat rate for this and it is forgettable. Here it is a percentage of the declared project cost, which has two consequences and one useful side effect.
The consequences are simple. On a large driveway the permit is genuine money and it should be itemised on your quote rather than appearing later. And a contractor who has never mentioned it has either absorbed it silently or has not priced it.
The side effect is the interesting part. Because the charge is calculated from the project cost declared to the Village, the number declared should match the number you were quoted. That is a free, verifiable consistency check on the person you are about to hand a large job to, and almost nobody thinks to run it. Ask what figure is going on the application.
Fact two: there is no register, so the vetting falls to you
Several municipalities nearby maintain a list, require a licence, or hold a bond against workmanship. Antioch does not. There is no roll to check a name against and no deposit lodged anywhere on your behalf.
This is genuinely a differentiator worth stating rather than glossing over, because the natural assumption runs the other way. People take a permit requirement as implying somebody vetted the contractor. Here, the permit governs the work, and the choice of who does it is entirely yours.
So do the checking that the Village does not:
- Ask for the certificate of insurance, and ask for it from the insurer rather than as a photograph. It is the single most useful document in this trade.
- Ask which figure goes on the permit application, per the section above.
- Ask who is pulling it. Get the answer in writing. Ambiguity here is the most common cause of a project sitting still for a fortnight.
- Ask for local addresses from the last two years, then go and look at the driveways. Concrete here has been through at least one salt season, which is when the difference between careful and careless becomes visible.
- Ask what happens if the ground under the old slab is worse than expected. A bid with a named allowance and a stated trigger is a bid from somebody who has done this before.
The geometry, and the clause worth knowing about
Two dimensional rules shape the drawing before anyone prices it, and the second has an exception that regularly saves a design.
Width is capped at the curb, and the measuring point is the thing people get wrong. Widening out near the house for parking is fine. The taper has to happen before the street.
The setback is the one that bites on a narrow lot. The relief, where the garage is side-loaded, is a green space provision between your driveway and next door's. If that describes your house, raise it at the first conversation. It is far cheaper as a design input than as a redesign.
The order to do this in
- Check the geometry against your lot before a drawing is made.
- Do your own vetting, because nobody else has.
- Agree in writing who applies, and on what declared cost.
- Permit, then crew. Not the other way round.
How all of this lands on a price, with the national figures beside it, is in our Antioch driveway cost guide. Still weighing up whether a rebuild is even the right project, the repair, resurface or replace comparison is the page to start from.
Get a quote from somebody who has read the code
Four quick questions and a local concrete contractor will be in touch to set up a free on-site estimate. We check the curb width and the setback against your lot before quoting the concrete driveway, and the permit appears as its own line.
Sources
- Village of Antioch Code section 10-6-5 - twenty foot maximum width at the curb, five foot property line setback, and the side-loaded garage green space exception (Ord. 19-12-43).
- Village of Antioch Code section 13-1-6 - driveway and parking lot permit fees at $50 minimum or 2% of estimated cost, plus the filing fee.
- Village of Antioch, Building and Code Enforcement - permit administration for residential work.