An exposed aggregate finish is the decorative option people most often assume they cannot afford, and it is frequently the cheapest way to get a surface that does not look like a plain grey slab. The figures below come from one national cost guide, gathered from across the country. None of it is a price from anyone who would come to your house, and nobody in Antioch should treat it as one. What it gives you is a scale to hold a bid against.

If you are still deciding what the surface should be, rather than what it costs, our concrete patio page covers the work itself and how a quote is arranged. This page is only about money.

The headline numbers

HomeGuide's guide sets out installed prices by patio size. Its own footnote matters as much as the table: the figures assume concrete four to five inches thick and exclude excavation and site preparation.

Patio sizePublished installed range
10 x 10 ft$700 to $1,800
12 x 12 ft$1,000 to $2,600
10 x 20 ft$1,400 to $3,600
15 x 15 ft$1,600 to $4,000
20 x 20 ft$2,800 to $7,200
24 x 24 ft$4,000 to $10,400

Per square foot, the guide gives $7 to $18 installed, split roughly into $2 to $6 of materials and $5 to $12 of labour. That split is the useful part. Labour is most of the bill, and labour on this finish is not the same as labour on a broomed slab, for a reason covered further down.

The thickness assumption lines up with what the Village already asks of a patio here, which is four inches at the least. If a bid for a patio is noticeably thinner than that, the saving is not a real one.

What the premium over plain concrete is buying

The guide puts the extra cost of the finish at about two to three dollars a square foot over ordinary concrete. Set against the other common surfaces, the ranges look like this.

SurfacePublished installed range, per sq ft
Plain concrete, broom finish$5 to $15
Exposed aggregate$7 to $18
Stamped concrete$8 to $19
Pavers$10 to $17

Those bands overlap so heavily that the table alone cannot tell you which finish will be cheapest at your address. What it does show is that the decorative step from plain to exposed is small compared with the spread inside any one row.

The premium pays for two things. The first is stone that looks good once it is uncovered, which ordinary mix aggregate may or may not. The second is a crew coming back at exactly the right moment to remove the surface paste. The guide describes a retarder sprayed on the fresh surface to hold the top layer back, a wait of up to a day, and then a pressure wash to reveal the stone. Get the timing wrong and there is no second attempt, which is why this finish is priced by the hour of skilled attention rather than by the bag of material.

The stone is the line that moves the number

Two quotes for the same patio can sit a long way apart and both be honest, and the stone is usually why. The guide lists material prices per ton, before any labour.

AggregatePublished price per ton
Crushed stone$10 to $50
Decomposed granite$45 to $95
Mexican beach pebbles$475 to $800
White pebbles$650 to $1,300

The top of that list costs well over ten times the bottom. A bid that simply says "exposed aggregate" without naming the stone has left the most expensive decision unstated.

The method matters as well. HomeGuide describes two ways of doing it. In the standard approach the decorative stone is mixed through the whole load, which gives the most even look and uses the most stone. In the seeded approach an ordinary slab is poured and the decorative aggregate is broadcast over the top, which uses far less. With a premium pebble, seeding can be the difference between a finish you like and one you cannot justify.

So the fair comparison between bidders is stone, method and area, all three written down. Anything less and you are comparing totals that describe different patios.

What sits outside the published range

Because the table excludes preparation, the items that most often turn a mid-range figure into a high one are the ones it leaves out.

  • An old slab to remove. The guide lists concrete removal at $3 to $8 a square foot including disposal.
  • Grading. Levelling or regrading a yard is listed at $0.40 to $2.00 a square foot.
  • Base stone. The Antioch patio spec wants a four-inch compacted CA-6 base, and on ground that holds water that base is doing real work rather than filling a line.
  • Access. If the mixer cannot get near the pour and the concrete has to be wheeled or pumped round the house, expect that to show up on the quote.

None of these are specific to exposed aggregate, but they land on this finish just the same, and they are the lines to look for when a quote seems high.

The running cost

An exposed surface is not a pour-and-forget finish, and the upkeep belongs in the comparison with plain concrete. The guide's maintenance figures:

Upkeep itemWhat the guide says
SealerA penetrating sealer is recommended
Reseal intervalEvery 2 to 3 years
Pressure washing$0.35 to $0.77 a sq ft
Washer pressureNo more than 3,000 PSI, or stones can loosen
Reported lifespan20 to 50 years with that upkeep

The pressure limit deserves attention. The instinct with a dirty pebble surface is more force, and more force is how stones start leaving. What a sealing visit costs at your square footage is set out in our piece on the published rates for sealing.

Where the money is well spent, and where it is not

Where the premium earns its keep: a path on a slope, a surround that gets wet, a large area that would look like a car park in plain grey, or a patio under trees where a busy surface hides staining. Our comparison of the pebble finish against a broomed one goes through those use questions properly.

Where it is harder to justify: a small sitting area where people go barefoot, or anywhere you will be clearing snow with a steel shovel every week. The guide itself lists "breaks a shovel" and damage from deicing salt among the downsides, and around here both of those are winter facts rather than footnotes.

The reasonable middle is common. An exposed border around a broomed field, or an exposed path leading to a plainer patio, puts the premium where people see it and keeps it off the square footage they only stand on.

When you have a rough area and a stone in mind, a site visit turns these ranges into an actual figure for your yard. You can book one from the patio page without committing to anything.

Sources

  1. HomeGuide, exposed aggregate patio cost - installed cost by patio size and per square foot, the materials and labour split, the premium over plain concrete, the comparison with plain, stamped and paver surfaces, aggregate prices per ton, the standard and seeded methods, removal and grading costs, and the sealing, washing and lifespan figures. Page written 17 April 2023, read 28 September 2026.

Get a Free Quote

Get your free, on-site quote.

Tell us about your project and we'll call you back the same day to set up a free measure and price.

Get your free quote

Tell us about your project and we will call you back the same day. No obligation.

What are you looking to do?
Roughly how big?
When are you thinking?

Pricing it out is fine. We will not chase you.

What is your ZIP code?

So we can confirm you are in the service area.

Where should we send it?

Free, no-pressure quote · Serving Lake County, IL

By submitting, you agree to our Privacy Policy and Terms, and consent to be contacted by phone, text, or email about your project, including by automated means. Consent isn't a condition of purchase. Msg & data rates may apply.

Tap to Call - (262) 228-5293